· Plotted project
Grand Vista, Sector 73 Gurgaon: a 28-plot colony on HRERA
1/6 checks doneNot visited yetHRERA GGM/560/292/2022/35
Short answerGrand Vista, Sector 73 Gurgaon, is a small licensed plotted colony by Pyramid Infratech. HRERA registration GGM/560/292/2022/35 covers 2.17 acres and 28 plots of about 120 to 146 gaj under licence 107 of 2021. The filing gives 15 December 2026 for completion, and the registration runs to that date.
- Developer
- Pyramid Infratech Pvt Ltd
- Location
- Sector 73
- Colony type
- DTCP licensed colony
- Plot sizes
- 120–146 gaj
- HRERA
- 1 record
- Checks done
- 1 of 6
- Project record
- HRERA phases
- Plot sizes
- Location
- Land use
- Layout and approvals
- Before you book
- Verification
- FAQs
Project record
| Developer / promoter | Pyramid Infratech Pvt Ltd |
|---|---|
| Sector | 73 |
| Colony type | DTCP licensed colony |
| DTCP licence | 107 of 2021 |
| HRERA registration | GGM/560/292/2022/35 (16 May 2022) |
| Area | 2.169 acres (Land area in Part B of the HRERA filing) |
| Plots (registered phases) | 28 |
| Plot sizes | 120–146 gaj (100.65 sq m to 121.67 sq m) |
| Asking price | Not available |
| Possession / completion | 15 Dec 2026 (in the filing) |
| Records last read | 12 Nov 2026 |
HRERA registrations and phases
Each row is one filing on haryanarera.gov.in, as we read it. Plot sizes are converted from square metres to gaj (1 gaj = 1 sq yd = 0.836 sq m).
| Phase | Registration | Type | Licence | Acres | Plots | Sizes (gaj) | Completion |
|---|---|---|---|---|---|---|---|
| Grand Vista | GGM/560/292/2022/35, 2022-05-16 | Plots | 107 of 2021 | 2.169 | 28 | 120–146 | 2026-12-15 |
Plot sizes from the HRERA filings
| Phase | sq m | gaj (sq yd) | sq ft |
|---|---|---|---|
| Grand Vista | 100.65 | 120 | 1,083 |
| Grand Vista | 102.3 | 122 | 1,101 |
| Grand Vista | 121.67 | 146 | 1,310 |
Sizes listed are those named in the filings we read, including the smallest, largest and most common. The full plot-size table is on each HRERA record linked above.
Where Grand Vista, Sector 73 is
Loads Google Maps. The pin is Google's search result for “Grand Vista Sector 73 Gurugram”, not a point we surveyed.
How the land is used
From Part C of each HRERA filing. It shows how much of the colony is sellable plots and how much is roads, parks and community sites.
Grand Vista
| Use | Acres | Share |
|---|---|---|
| Roads | 1.15 | 55% |
| Plots to be sold | 0.758 | 36% |
| Parks and playgrounds | 0.108 | 5% |
| Electricity sub-station | 0.049 | 2% |
| Sewage and solid waste | 0.02 | 1% |
| Total in the table | 2.085 | 100% |
Construction start in the filing: 2022-06-15. Estimated project cost: ₹5,543.5 lakh.
Layout plan, zoning and approvals
These are the developer's own uploads on haryanarera.gov.in. Open the layout plan and find your plot number on it before you pay anything. Links go to the HRERA portal; we do not copy or edit these files.
Grand Vista
| Document | Uploaded to HRERA |
|---|---|
| Licence and schedule of land | 14-04-2022 |
| Layout plan | 14-04-2022 |
| Demarcation plan | 14-04-2022 |
| Sewerage plan | 14-04-2022 |
| Water supply approval | 14-04-2022 |
| Layout plan | 18-05-2022 |
| Payment plan | 18-05-2022 |
| Forest department NOC | 19-05-2022 |
| Zoning plan | 19-05-2022 |
| Demarcation plan | 20-05-2022 |
About Grand Vista
Grand Vista is filed with HRERA Gurugram by Pyramid Infratech Pvt Ltd as GGM/560/292/2022/35, dated 16 May 2022, under licence 107 of 2021. It is in Sector 73, Gurgaon (Gurugram), and lists 28 plots on 2.17 acres.
Part C puts 1.15 acres under roads and 0.76 acres under plots, which suggests the filing covers a pocket within a larger licensed area; the layout plan linked from the filing shows where it sits. No completion certificate is uploaded yet; the filing gives 15 December 2026, the same day the registration ends.
What the filings show
| Filing | HRERA number | Licence | Land (acres) | Plots | Sizes (gaj) | Start | Completion in filing | Status on HRERA |
|---|---|---|---|---|---|---|---|---|
| Grand Vista | GGM/560/292/2022/35 | 107 of 2021 | 2.17 | 28 | 120–146 | 15 Jun 2022 | 15 Dec 2026 | Registered to 15 Dec 2026 |
In Grand Vista (GGM/560/292/2022/35), plots take 0.76 of the 2.09 acres in Part C (36%); roads 1.15, parks and playgrounds 0.11, electricity sub-station 0.05 acres.
The layout, zoning and demarcation plans and the licence are linked from each filing in the documents section above; they open on haryanarera.gov.in.
Quarterly progress reports: not available in the records we read (12 Nov 2026). HRERA publishes them on each registration’s progress page; we will add them with their dates.
Location
The filing gives Sector 73, Gurugram (Badshahpur sub-tehsil), with no coordinates.
Drive times: not available yet. We have not visited the site, and we do not quote distances we have not measured.
Price
Price: not public in the records. HRERA filings do not carry asking prices, and we have not yet confirmed a current price from two dated sources. Ask us on WhatsApp for what sellers are quoting now.
Before you book in Grand Vista, Sector 73
The records we read show no lapsed registration, passed completion date or contradiction for this colony. Run the general checks below before you pay.
Verification status
- HRERA registration found on haryanarera.gov.in 12 Nov 2026
- DTCP licence number and colony type recorded open
- Approved layout plan matches the brochure open
- Litigation search on developer and project open
- Location checked against Aravalli and NCZ maps open
- Asking price confirmed from two sources open
A Verified stamp appears only when all six checks are dated. How we verify.
Site visit
Site-visit photos: not available yet. We have not visited this site; the facts on this page come from the HRERA records.
Grand Vista, Sector 73: questions buyers ask
What is the HRERA registration number of Grand Vista?
HRERA Gurugram lists GGM/560/292/2022/35 (16 May 2022).
What plot sizes are there in Grand Vista?
The plot-size tables in the filings list 28 plots from 100.65 to 121.67 sq m, about 120 to 146 gaj. The most common entry is 102.3 sq m (122 gaj), 12 plots.
When is Grand Vista due for completion?
Grand Vista: 15 Dec 2026 in the filing. No completion certificate is uploaded on the records we read (12 Nov 2026).
Compare with nearby projects
Sources
- HRERA Gurugram: Grand Vista, full filing, read 12 Nov 2026